Serial Number | 97743746 |
Word Mark | A DIFFERENT KIND OF ENERGY |
Filing Date | Friday, January 6, 2023 |
Status | 654 - REPORT COMPLETED SUSPENSION CHECK - CASE STILL SUSPENDED |
Status Date | Wednesday, November 13, 2024 |
Registration Number | 0000000 |
Registration Date | NOT AVAILABLE |
Mark Drawing | 4 - Illustration: Drawing with word(s) / letter(s) / number(s) in Block form |
Published for Opposition Date | NOT AVAILABLE |
Goods and Services | Generation of energy from renewable sources including solar, wind, water and biomass; generation of electricity from solar energy; leasing of renewable energy equipment for use in converting renewable resources into power; providing information about generation of electricity from solar panel devices and related equipment; providing on line information in the field of electricity generation and production of solar energy through electronic transmission over a global computer information network; leasing of solar panel devices and other related equipment adapted for use in converting solar energy into electricity; Marketing the goods and services of others in the field of solar and photovoltaic power generation technology and products to commercial, industrial, and residential customers; Design of solar photovoltaic systems; technical planning in the nature of design of solar installations; monitoring of solar panels and other equipment for use in converting solar energy into electricity for quality control purposes, engineering purposes, and to ensure proper functioning; monitoring of solar power for quality control purposes, engineering purposes, and to ensure proper functioning; monitoring of efficiency, production levels and other performance data of solar panels and other equipment for use in converting solar energy into electricity for quality control purposes, engineering purposes, and to ensure proper functioning; monitoring of solar systems for efficiency, production levels, and other performance data of solar systems for others for quality control purposes, engineering purposes, and to ensure proper functioning; providing solar photovoltaic system quality evaluation services, namely, collecting data and generating models of location-specific conditions including dimensions, sunshine and shade characteristics at solar panel installation sites; Installation of renewable energy equipment and systems for residential and commercial purposes; installation and maintenance of solar energy based power plants; installation of solar installations; installation of renewable energy systems for solar energy collection and dispersion; installation of solar energy systems and alternative energy products for residential and commercial use; repair and maintenance of photovoltaic installations; Utility services, namely, transmission of electricity; solar power distribution services |
International Class | 040 - Treatment of materials. |
US Class Codes | 100, 103, 106 |
Class Status Code | 6 - Active |
Class Status Date | Monday, January 30, 2023 |
Primary Code | 040 |
First Use Anywhere Date | NOT AVAILABLE |
First Use In Commerce Date | NOT AVAILABLE |
Party Name | Georgia Power Company |
Party Type | 10 - Original Applicant |
Legal Entity Type | 03 - Corporation |
Address | Atlanta, GA 30308 |
Event Date | Event Description |
Friday, October 6, 2023 | NON-FINAL ACTION E-MAILED |
Monday, January 30, 2023 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
Friday, September 29, 2023 | ASSIGNED TO EXAMINER |
Friday, October 6, 2023 | NON-FINAL ACTION WRITTEN |
Friday, October 6, 2023 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
Wednesday, December 6, 2023 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
Wednesday, December 6, 2023 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
Wednesday, December 6, 2023 | TEAS/EMAIL CORRESPONDENCE ENTERED |
Monday, December 11, 2023 | SUSPENSION LETTER WRITTEN |
Monday, December 11, 2023 | LETTER OF SUSPENSION E-MAILED |
Monday, December 11, 2023 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
Tuesday, October 29, 2024 | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION |
Wednesday, November 13, 2024 | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED |